Barrhead Housing Association
Through the I-Flair Property Maintenance framework, Barrhead Housing Association directly awarded us an initial contract for kitchen replacements and associated electrical rewires to 48 three storey sandstone tenement properties in Erskine.
Due to the success of this scheme, the association extended the contract to cover an additional 12 homes in the area. Across the 60 properties, there were three general kitchen types. The scope of works included:
- Kitchen installation
- Extract fan installation
- Vinyl slip resistant flooring
- Full electrical rewire including isolator switch and consumer unit
We also carried out a number of additional works to help the association meet the Scottish Housing Quality Standard (SHQS), including:
- Internal wall insulation works and repairs
- Hard wired smoke detector
- Bathroom extractor fans
- Bathroom suite installation including Mira shower, shower rail and curtain
- Respatex wet wall panels within bathroom
- Pass door installation between bathroom and kitchen
- Front and door replacement
As a multi-disciplined contractor, we were able to carry out all additional works using our directly-employed workforce.
Back to all case studies